SPOKANE, WA - November 28, 2005 - Minera Andes Inc. (TSX-V: MAI and
US OTC: MNEAF) is pleased to announce a letter of intent has been signed
with Xstrata Copper regarding the Los Azules porphyry copper project
in San Juan province, Argentina. Xstrata Copper and Minera Andes had
been working on separate, adjoining properties that straddle a large
copper porphyry system now consolidated into one package (see attached
map). Xstrata Copper is one of the commodity business units within
Xstrata plc (London Stock Exchange:XTA.L and Zurich Stock Exchange:
XTRZn.S).
Allen Ambrose, president of Minera Andes, said "We are very pleased as
this agreement will enable us to explore 100 percent of the primary
target at Los Azules. This type of geologic setting and mineralization
can be amenable to low cost mining and recovery methods. There are
several mines in production with the same mineralogy and grade of copper
identified in our recent drilling. These discovery drilling results
speak to the project's potential."
The Los Azules project was discovered by Minera Andes' geologists
through regional exploration near the Argentina/Chile border. The
combined Minera Andes-Xstrata Copper property package (approx. 7,500 Ha)
encompasses a large, enriched (chalcocite) copper zone at Los Azules.
The overall target area is approximately 2,700 meters by 700 meters as
currently defined (see attached map). Past drilling consists of 15
reverse-circulation and 9 core holes (totaling 5,481 meters) drilled by
Minera Andes, Xstrata Copper and Battle Mountain Gold between 1998 and
2004. Eight holes intersected significant copper mineralization greater
than 0.4 percent in an area defined by geology, MIMDAS deep penetration
IP and magnetic geophysical surveys. The best hole, LA-08-98
encountered 0.55 percent copper over 143 meters and ended in
mineralization. The remainder of the holes returned copper values
between nil and those shown in the table below.
In the letter of intent, subject to TSX-V approval, Minera Andes has the
right to earn a 100 percent interest in Xstrata Copper's property by
spending at least US$1.0 million on the property over the next four
years, making payments to keep the property in good standing and
producing preliminary economic assessment (to NI 43-101 standards). If
the preliminary assessment shows the project to be potentially
economically viable and can be expected to produce 100,000 tonnes of
copper per year for 10 years then Xstrata Copper will have a one time
back-in right to earn a 51 percent interest in the combined properties
by making a cash payment to Minera Andes of three times its expenditures
on the property, completing a bankable feasibility study within five
years and assuming underlying property commitments. In the event that
the preliminary assessment does not meet the size criterion contemplated
above, Xstrata Copper would retain a first right of refusal on any
subsequent sale of the property.
The highlights of the drilling are as follows:
---------------------------------------------------------------------
Significant Drilling Results at Los Azules
---------------------------------------------------------------------
Intersection Total
TD From To Interval Copper
Drill Hole (m) (m) (m) (m) (%)
---------------------------------------------------------------------
AZ-04-01 (core) 195 130 195 56 0.62
Includes: 150 192 36 0.82
---------------------------------------------------------------------
AZ-04-02 (core) 330.5 164 304 140 0.38
Includes: 164 190 26 0.47
Includes: 230 304 72 0.42
---------------------------------------------------------------------
AZ-04-04 (core) 300.8 162 282 120 0.54
Includes: 162 202 40 0.59
Includes: 236 282 46 0.64
---------------------------------------------------------------------
AZ-04-07 (core) 168.8 96 152 56 0.44
Includes: 126 152 26 0.58
---------------------------------------------------------------------
LA-04-98 (RC) 250 117 250 133 0.47
---------------------------------------------------------------------
LA-06-98 (RC) 250 61 250 189 0.44
Includes: 157 250 93 0.64
---------------------------------------------------------------------
LA-08-98 (RC) 220 77 220 143 0.55
Includes: 103 220 117 0.61
---------------------------------------------------------------------
LA-03-04 (RC) 226 94 226 132 0.40
Includes: 104 114 10 1.12
---------------------------------------------------------------------
Drilling at Los Azules encountered features typical of many porphyry copper systems. In the discovery zone, strongly leached cap rock extends between 61 to 164 meters beneath the surface, and lies above an enriched zone of secondary copper mineralization (chalcocite) overlying a zone of mixed secondary and primary (chalcopyrite) copper mineralization.
All results have been reviewed by Brian Gavin, Minera Andes'
vice president of exploration and an appropriately qualified person as
defined by National Instrument 43-101.
Xstrata Copper is one of the commodity business units within the
major global diversified mining group Xstrata plc, which is listed on
the London and Zurich stock exchanges and is based in Switzerland.
Xstrata maintains a meaningful position in six major international
commodity markets: copper, coking coal, thermal coal, ferrochrome, zinc
and lead on four continents and seven countries: Australia, South
Africa, Spain, Germany, Argentina, Peru and the UK. Through subsidiaries
in Argentina and Australia, Xstrata Copper is a top 10 global copper
producer. In Argentina, Xstrata Copper annually produces 180,000 tonnes
of copper in concentrate and 633,000 ounces of gold in concentrate and
dore from one of the world's major copper deposits, Bajo de la
Alumbrera.
Minera Andes is a gold, silver and copper exploration company working
in Argentina. Minera Andes holds about 500,000 acres of mineral
exploration land in Argentina, including the co-owned Huevos Verdes/San
José silver/gold project now under construction and feasibility
consideration for possible mine production. Minera Andes has also
discovered an enriched copper zone at its Los Azules property and is
acquiring other exploration targets in southern Argentina. The
Corporation presently has 90,944,431 issued and outstanding shares.
This news is submitted by Allen V. Ambrose, president and director of Minera Andes Inc.
For further information, please contact: Art Johnson at the Spokane
office, or Krister A. Kottmeier, investor relations - Canada, at the
Vancouver office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Rd., Suite A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
410-744 West Hastings Street
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
FORWARD-LOOKING STATEMENT - Although Minera Andes believes many
of its properties have promising potential, the Los Azules property in
the early stages of exploration. It as yet been shown to contain proven
or probable mineral reserves. There can be no assurance that such
reserves will be identified on the property, or that, if identified,
mineralization may be economically extracted. The Corporation's results
will be subject to known and unknown risks and uncertainties that may
cause the Corporation's actual results to in future periods to differ
materially from forecasted or anticipated results. Among those factors
which could cause actual results to differ materially are the following:
the risks inherent in mineral exploration and the mining industry, the
Corporation's needs for additional capital, and other risk factors
listed from time to time in the Corporation's public filings.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.