SPOKANE, WA -- December 18, 2006 -- Minera Andes (TSX-V: MAI and US OTC:
MNEAF) is pleased to announce that drilling has commenced at the Los
Azules porphyry copper system in the San Juan province, central
Argentina. One core rig is on the property and another rig is
anticipated within a week.
A total of 30 holes, totaling approximately 10,500 meters, are planned
for the current campaign, commencing on the southern half of the
mineralized copper target. The holes will be drilled to a depth of
approximately 350 meters. This drilling will test a known area of
leachable (chalcocite) and sulfide (chalcopyrite) copper mineralization
currently defined by 15 previous drill holes. The area to be drilled
covers approximately 2,500 by 750 meters. Holes will be drilled at a
nominal grid spacing of 200 meters east-west and 400 meters north-south.
The exploration program is designed to define an inferred resource and
provide sufficiently detailed information to allow the completion of a
Preliminary Assessment (as defined by NI 43-101) of the property. To
this end the engineering firm of Gustavson and Associates has been
retained to monitor the program and prepare the NI 43- 101 resource
estimate and Preliminary Assessment report. The field work will be
managed by Nivaldo Rojas and Associates under the supervision of Minera
Andes' technical staff.
Core drilling in early 2006 (see Table 1) focused on an enriched copper
target previously defined by prior drilling, an area approximately 2,500
meters by as much as 1,500 meters (see attached map). Drilling tested
mineralization on both Minera Andes' lands and adjacent lands held by
Xstrata Copper. Xstrata Copper is one of the commodity business units
within Xstrata plc (London Stock Exchange:XTA.L and Zurich Stock
Exchange: XTRZn.S). An eleven hole drill program in early 2006 returned
intervals up to 1.62% copper over 221 meters and 1.00% copper over 173
meters in separate holes.
 Allen Ambrose, president of Minera Andes, said, "Our technical team made
a second discovery in Argentina during the previous drilling season.
Our careful, consistent, methodical exploration has now resulted in two
discoveries with our San José project now going into production and the
new exciting Los Azules drilling results. The northern portion of the
Los Azules target where the new drilling has discovered thick sections
of plus one percent copper is exciting in that we see a large copper
target developing that is near surface and high grade. We look forward
to reporting on the ongoing exploration program at this exciting
discovery next year when drilling is completed."
Eleven reconnaissance core holes, totaling 3,426 meters, were drilled in
the earlier campaign to depths of between 133 to 316 meters. The
primary focus of the drilling was to test the grade and continuity of
known leachable (chalcocite) copper mineralization identified in prior
drill campaigns (see Table 2). Drilling at Los Azules continues to
encounter features typical of many porphyry copper systems. In the
discovery zone, strongly leached cap rock extends from the subcrop to as
much as 161 meters beneath the surface followed by an enriched zone of
secondary copper mineralization (chalcocite) overlying a zone of mixed
secondary and primary (chalcopyrite) copper mineralization. The majority
of holes shown in Table 1 ended in mineralization. Drill holes
AZ-06-12, 13, 15, 16, and 18 returned lower copper values ranging from
nil to 0.5 percent copper.  All
results have been reviewed by Brian Gavin, Minera Andes' vice president
of exploration, an appropriately qualified person as defined by
National Instrument 43-101. Minera Andes is a gold, silver and
copper exploration company working in Argentina. Minera Andes holds
about 440,000 acres of mineral exploration land in Argentina, including
the co-owned San José silver/gold project now under construction and
development for planned mine production and is acquiring other
exploration targets in southern Argentina. The Corporation presently has
156,489,415 issued and outstanding shares. For further
information, please contact: Art Johnson at the Spokane office, or
Krister A. Kottmeier, investor relations -- Canada, at the Vancouver
office. Visit our Web site: www.minandes.com Spokane Office 111 East Magnesium Rd., Suite A Spokane, WA 99208 USA Phone: (509) 921-7322 E-mail: info@minandes.com Vancouver Office 410-744 West Hastings Street Vancouver, B.C. V6C 1A5 Phone: (604) 689-7017; 877-689-7018 E-mail: ircanada@minandes.com FORWARD-LOOKING
STATEMENT --The Corporation's results will be subject to known and
unknown risks and uncertainties that may cause the Corporation's actual
results in future periods to differ materially from forecasted or
anticipated results. Among those factors which could cause actual
results to differ materially are the following: the risks inherent in
mineral exploration and the mining industry, the Corporation's needs for
additional capital, and other risk factors listed from time to time in
the Corporation's public filings. In addition, the target as currently
defined at Los Azules straddles lands owned by Minera Andes and lands
held by Xstrata Copper. Minera Andes is currently in negotiations with
Xstrata Copper to complete a definitive joint venture agreement for the
project. There can be no assurance that the parties will reach agreement
to from a joint venture over their respective holdings at Los Azules.VTHE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
|